Logging punch-snags is only half the battle. Modern hotel renovations uncover 40–50 snags per room (vs. <12 historically), driving teams to capture and resolve thousands of defects. FinishLine moves each punch-snags item from baseline to final turnover—no stage left behind.
Phase 1: Pre-Punch—Baseline Your Project
- When: Pre-reno & pre-logistics
- Why: Document existing damage to avoid liability
- Benefits: Rapid floorplan logging, private baseline PDFs, selective visibility
Phase 2: GC Punch & Snags—Boost Coverage
- Issue: Manual checks miss up to 60% of snags
- FinishLine: Defined Spaces taps + trade buckets ensure 100% coverage
Phase 3: Owner/Architect Punch—Catch What’s Left
- Overlap: Architects sample rooms; logging alone can’t enforce fixes
- FinishLine: Sub portals + BallinCourt workflows assign, verify, and close snags
Phase 4: FF&E Punch & Snags—Protect Your Install
- Dual Checks: Pre-logistics baseline + post-install owner rep punch-snags
- Track: FF&E & OS&E from warehouse → transit → install → damage → close
- Benefits: Item workflows + photoverified closeouts
EndtoEnd Fix & Turnover
- Traditional tools: Stop at logging/reporting
- FinishLine: capture → assign → fix → verify → reopen → turnover
- Outcome: Faster, cleaner handovers at any scale